New construction of a commercial and office complex with an underground parking lot on two levels, a transformer substation and a roof boiler house on the street. Antonovycha, 120; St. Antonovycha 122-122a; Heroiv UPA St., 73; with the demolition of existing buildings
Lviv, Ukraine
"Vertical" shopping and office center on 36,500 m2
A shopping and office center with an underground parking lot on two levels and a built-in boiler room, on the street. Voloska 1
Lviv, Ukraine
Trade and office center on 14,760 m2
Lviv, Ukraine
"Vertical" shopping and office center on 36,500 m2
Lviv, Ukraine
Trade and office center on 14,760 m2
Construction of a multi-functional complex of non-residential and residential buildings with built-in public spaces, an institution for preschool children, a transformer substation, a roof boiler room and an underground parking lot, with the demolition of existing buildings on the street B. Khmelnytskoho, 207
Lviv, Ukraine
Residential complex "Vezha"
Construction of a residential and office complex with built-in public service facilities, an underground parking lot, a transformer substation and a roof-top boiler house by "Renovation" LLP on St. Zelenii, 151 with the demolition of existing buildings. Sections 3-4
Lviv, Ukraine
Residential complex "Viking"
Lviv, Ukraine
Residential complex "Vezha"
Lviv, Ukraine
Residential complex "Viking"
A hospital complex (five sites -Akotombra, Elubo, Nsuaem, Bogoso, Wassa Dunkwa) with an appropriate set of facilities (hospital, ward block, mortuary, utility block, mother and child building, kitchen, etc.) in the Republic of Ghana, Africa.
Republic of Ghana, Africa
Complex of hospitals
Reconstruction of the existing concrete plant with installation of additional equipment for the production of mineral mixtures (asphalt concrete) at the address: st. Promyslova, 5.
Uzhhorod, Ukraine
Reconstruction of the existing concrete plant
Комплекс лікарень (п’ять ділянок -Akotombra, Elubo, Nsuaem, Bogoso, Wassa Dunkwa) з відповідним набором споруд (лікарня, блок палат, морг, господарський блок, будівля матері та дитини, кухня, тощо) в Республіці Гана, Африка.
Republic of Ghana, Africa
Complex of hospitals
Реконструкція діючого бетонного заводу з влаштуванням додаткового обладнання для виготовлення мінеральних сумішей (асфальтобетонну) за адресою: вул. Промислова, 5.
Uzhhorod, Ukraine
Reconstruction of the existing concrete plant
The main engineering systems were developed in the project: heating, ventilation and air conditioning, hot water supply, ITP. The project envisages the main source of heat for the heating and hot water systems from the VRF system.
Lviv, Ukraine
Construction of a hotel with administrative and commercial premises and a built-in boiler room
The project consists of 3 silos, each loading 2079 tons of grain. In the design process, the stipulated conditions due to the proximity of the railway track to the pit of the silos were taken into account. Designing of boreholes, boreholes and coveyers.
Uzhhorod, Ukraine
Reconstruction of the transfer station
Lviv, Ukraine
Construction of a hotel with administrative and commercial premises and a built-in boiler room
Uzhhorod, Ukraine
Reconstruction of the transfer station
Реконструкція пере-вантажувальної станції
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical engineering solutions, ITP.
Lviv, Ukraine
Construction of a private school "MriiDii"
Reconstruction of the aspiration system from knitting machines. A system was installed at the factory that did not work correctly, our engineers analyzed the aerodynamic calculation of the existing system, changed the layout within the existing specification.
Chervonograd, Ukraine
Factory LLC "Duna West"
Lviv, Ukraine
Construction of a private school "MriiDii"
Chervonograd, Ukraine
Factory LLC "Dune West"
The main engineering systems were developed: heating, ventilation and air conditioning, water supply and drainage, electrical engineering solutions, ITP, as well as external power and heat supply networks.
Pasyky-Zburytsky village, Lviv region, Ukraine
Logistics center "Port-2"
The reconstruction project of a part of a non-residential building under the letter A-3 (electrical assembly shops, medical center), at 57 Vitovsky St., in the city of Lviv, for the implementation of the investment project "Reconstruction of the tram depot with the aim of creating an innovative and creative space
Lviv, Ukraine
Creative hub "LEM Station"
Pasyky-Zburytsky village, Lviv region, Ukraine
Logistics center "Port-2"
Lviv, Ukraine
Creative hub "LEM Station"
New construction of a multi-functional complex with housing for temporary housing of internally displaced persons, built-in parking, transformer substation and engineering facilities on the street. AND. Mykolaychuk
Lviv, Ukraine
Construction of a multifunctional complex with housing for temporary residence of internally displaced persons
The main engineering systems were developed in the project: water supply and drainage. The project is carried out according to local regulations. The drainage system uses modern energy-saving equipment for wastewater treatment.
Mestia, Georgia
SPA center in the hotel complex
Lviv, Ukraine
Construction of a multifunctional complex with housing for temporary residence of internally displaced persons
Construction of a multifunctional complex with housing for temporary residence of internally displaced persons
Mestia, Georgia
SPA center in the hotel complex
New construction of a scientific research center with a roof-mounted boiler house with blocking to a public building with the demolition of the existing group of non-residential premises on the street. Zamarstinivska, 83-A in Lviv
Lviv, Ukraine
ITSTEP Academy
The project for the development of water supply and sewage systems for the SPA complex in Georgia includes the integration of modern engineering solutions into the complex conditions of the existing building.
Batumi, Georgia
SPA center
Lviv, Ukraine
ITSTEP Academy
Batumi, Georgia
SPA center
Construction of a residential complex by "Villa Magnolia" LLC as part of: a multi-apartment residential building with built-in premises on the street. M. Pymonenko - str. Pasichna in the horticultural society "Geologist" in Lviv.
Lviv, Ukraine
Villa Magnolia
Reconstruction of the buildings of Selydiv Secondary School No. 2 at the address: Donetsk region, Selidove, str. Nezalezhnosti, 39-A
Selidove (Donetsk region), Ukraine
Selydiv secondary school No. 2
Lviv, Ukraine
Villa Magnolia
Selidove (Donetsk region), Ukraine
Selydiv secondary school No. 2
OUR PROJECTS RECOGNIZED IN THE WORLD
80%
projects are carried out for regular customers
120
of projects completed by the company in general
100%
our customers and partners are ready to recommend us for engineering services
Construction of a multi-functional complex of non-residential and residential buildings with built-in public spaces, an institution for preschool children, a transformer substation, a roof boiler room and an underground parking lot, with the demolition of existing buildings on the street. B. Khmelnytskogo, 207 in the city Lviv
A large residential complex was built in Lviv by RIEL. The main engineering systems were developed in the project: heating and ventilation, water supply and drainage, electrical solutions, boiler room, boiler room automation. The solution for sewage systems was not typical, because due to the lack of parking, the networks were laid under the foundation slab and a complex of measures for planned maintenance and operation of the networks was foreseen.
Design environment: REVIT
Partner: AVR
Customer: RIEL
Area: 77 700 м2
Residential complex "VEZHA" (RIEL)
ENGINEERING AND CONSULTING
New construction of a multi-functional complex with housing for temporary housing of internally displaced persons, built-in parking, transformer substation and engineering facilities on the street. AND. Mykolaychuk in Lviv (cadastral number 4610137500:08:001:0921)
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical engineering solutions, ITP, ITP automation. The project provided for the main source of heat for the heating and hot water supply systems from the heat pump and the solar collector system, the additional/reserve source was provided by Lvivteploenergo city networks. The object is also equipped with a system of solar collectors that provide power supply to a part of the engineering systems that require the first category of power supply reliability. a modern anti-radiation shelter (PRU) is designed on the project
Design environment: REVIT
Partner: AVR
Construction of a multifunctional complex with housing for temporary residence of IDPs
ENGINEERING AND CONSULTING
Construction of a residential and office complex with built-in public service facilities, an underground parking lot, a transformer substation and a roof-top boiler house by "Renovation" LLP on St. Zelenii, 151 with the demolition of existing buildings. Sections 3-4
The main engineering systems were developed in the project: heating, ventilation and air conditioning, cold storage, ITP, automation of the cold center and ITP.
Design environment: REVIT
Partner: AVR
Area: 1 920 м2
Customer: VIKING
Residential complex "Viking"
ENGINEERING AND CONSULTING
Construction of an educational institution on St. Uhorska, 14 in the city Lviv with the demolition of existing buildings.
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical engineering solutions, ITP. Modern private school, Lviv branch of KMDSH. An educational institution with various groups and specialized classes, a dining hall for 500 students with a full-service kitchen.
Design environment: AUTOCAD
Partner: AVR
Area: 7 160 м2
Customer: CICSh
Construction of a private school "MriiDii"
ENGINEERING AND CONSULTING
The reconstruction project of a part of a non-residential building under the letter A-3 (electrical assembly shops, medical center), at 57 Vitovsky St., in the city of Lviv, for the implementation of the investment project "Reconstruction of the tram depot with the aim of creating an innovative and creative space
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical solutions, heat generator, heat generator automation. The project provides for the main heating from the VRF system, which provides heat to each floor separately. According to the wishes of the Customer, reserve / additional heating with a water warm floor is also designed. This building is an architectural monument, it is located in the historical area of the city. Lviv.
Design environment: AUTOCAD
Partner: AVR
Area: 3 950 м2
Customer: LEM STATION
Creative hub "LEM Station"
ENGINEERING AND CONSULTING
New construction of a commercial and office complex with an underground parking lot on two levels, a transformer substation and a roof boiler house on the street. Antonovycha, 120; St. Antonovycha 122-122a; Heroiv UPA St., 73; with the demolition of existing buildings in Lviv
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical solutions, refrigeration plant, boiler house, automation of refrigeration plant and boiler house. The complex is divided into 2 functional sections (business center and commercial office center). The object is interesting because the business center is a 15-story building with glass facades, the solution for laying engineering networks is organized near the rigid core of the building with designated areas for maintenance. The building has two levels of underground parking.
Design environment: REVIT
Partner: AVR
Area: 36 550 м2
Customer: KARELIA
"Vertical" shopping and office center
ENGINEERING AND CONSULTING
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical solutions, refrigeration plant, boiler house, automation of refrigeration plant and boiler house.
The project envisages a heating and cooling center, the main source of heat is provided by chillers with the function of a heat pump, the auxiliary source is gas fuel and an electric boiler. The operation of the equipment is fully automated and allows you to adjust the internal parameters of the system according to the tenant's requirements, and the heat source is switched according to the specified work algorithms.
Design environment: REVIT
Partner: AVR
Area: 14 680 м2
Customer: MEGA TECH
Trade and office center
ENGINEERING AND CONSULTING
A hospital complex (five sites -Akotombra, Elubo, Nsuaem, Bogoso, Wassa Dunkwa) with an appropriate set of facilities (hospital, ward block, mortuary, utility block, mother and child building, kitchen, etc.) in the Republic of Ghana, Africa.
Execution project for a foreign company ... All engineering calculations were carried out in accordance with local building regulations. The object was executed in the Revit environment, all specifications and detailing were developed in the BoQ form. According to the functionality, the hospital building was divided into several functional buildings (medical, surgical, maternity, etc.)
Design environment: REVIT
Partner: KREOPLAN
Area: 14 250 м2
A complex of hospitals in the Republic of Ghana, Africa.
ENGINEERING AND CONSULTING
The main engineering systems were developed in the project: water supply and drainage. The project is carried out according to local regulations.
The drainage system uses modern energy-saving equipment for wastewater treatment. The water supply of the SPA center is organized according to technological solutions and provides for different water consumption zones that require high-quality water preparation.
Design environment: REVIT
Area: 850 м2
SPA center of the hotel complex
ENGINEERING AND CONSULTING
Reconstruction of the existing concrete plant with installation of additional equipment for the production of mineral mixtures (asphalt concrete) at the address: st. Promyslova, 5, m. Uzhhorod, Zakarpatska oblast.
The project provides for the reconstruction of the existing concrete plant, the Customer purchased a line for the production of mineral mixtures. Our company performed a complex of design works taking into account technological solutions, construction, engineering networks, construction technology and reducing the sanitary protection zone to the existing building.
Technological equipment for the preparation of asphalt-concrete mixtures (complex) with a capacity of 60 t/h
Design environment: AUTOCAD
Customer: Primeinvestbud
Reconstruction of the existing concrete plant
ENGINEERING AND CONSULTING
Construction of a canopy and reconstruction of a transshipment station in the industrial zone 89502, Zakarpattia region.., m. Chop, Uzhgorodska St., 7, on its own plot of land.
Silo-type granary (SMVU 146.12.B1). Capacity – 6237 tons (3x2079 tons). The maximum height is 18,680 m.
The project consists of 3 silos, each loading 2079 tons of grain. In the design process, the stipulated conditions due to the proximity of the railway track to the pit of the silos were taken into account. Designing of boreholes, boreholes and coveyers.
Design environment: AUTOCAD
Customer: PrimeInvestBud
Reconstruction of the transfer station
ENGINEERING AND CONSULTING
New construction of the postal and logistics complex on the land plot number 4623685100:04:000:2828 in the village of Pasyky-Zubrytsky, Davydivska TG, Lviv district, Lviv region.
The main engineering systems were developed in the project: heating, ventilation and air conditioning, water supply and drainage, electrical engineering solutions, ITP, as well as external power supply and heat supply networks. The difficulty was that the Customer is dynamic because during the design process the functionality of the premises/building changed according to the potential owner/tenant.
Design environment: AUTOCAD
Partner: VR GROUP
Customer: Altera Group
Logistics Center "Port-2"
ENGINEERING AND CONSULTING
Reconstruction of the aspiration system from knitting machines. A system was installed at the factory that did not work correctly, our engineers analyzed the aerodynamic calculation of the existing system, changed the layout within the existing specification. To date, the system performs its functions correctly.
Design environment: AUTOCAD
Customer: LLC "DUNA WEST"
Factory "Dune West" LLC
ENGINEERING AND CONSULTING
New construction of a hotel with administrative and commercial premises and a built-in boiler room on the square. AND. Mickevycha, 9 in the city Lviv.
The main engineering systems were developed in the project: heating, ventilation and air conditioning, hot water supply, ITP. The project envisages the main source of heat for the heating and hot water systems from the VRF system. A 3-pipe air conditioning system using KIT for hot water preparation through a heat recovery system. In the basement there is a central heating point for tanks of prepared hot water and a water treatment system.
Dwsign environment: AUTOCAD
Hotel with administrative and commercial premises
ENGINEERING AND CONSULTING
New construction of a scientific research center with a roof-mounted boiler house with blocking to a public building with the demolition of the existing group of non-residential premises on the street. Zamarstinivska, 83-A in Lviv
Our electrical solutions project includes a wide range of areas covering both common areas and technical areas, including parking, using modern design technologies in the BIM environment.
The project takes into account engineering networks and coordination of engineering systems using Autodesk Revit and Navisworks software, which allowed to avoid conflicts and ensure optimal location of equipment.
Design environment: REVIT
Customer: LLC "CA SHAG LVIV PCO"
ITSTEP Academy
ENGINEERING AND CONSULTING
The project for the development of water supply and sewage systems for the SPA complex in Georgia includes the integration of modern engineering solutions into the complex conditions of the existing building.
The central aspects of the project include the creation of an efficient hot water supply system, the optimization of the radial water supply system and the implementation of a highly efficient sewage system using pumping equipment.
To achieve high accuracy in the design and coordination of all engineering systems, the project was developed using the Autodesk Revit program, which provided a detailed 3D modeling of the complex. Project coordination and conflict resolution between existing and new engineering systems was handled through Navisworks, which helped streamline the project and ensure its implementation without significant delays or additional costs.
Design environment: REVIT
SPA center
ENGINEERING AND CONSULTING
Construction of a residential complex by "Villa Magnolia" LLC as part of: a multi-apartment residential building with built-in premises on the street. M. Pymonenko - str. Pasichna in the horticultural society "Geologist" in Lviv.
External electric lighting, developed as part of the project using Autodesk AutoCAD, DIALux and DIALux Evo programs, is an integrated system that not only provides effective lighting of the object, but also adds to its aesthetic appearance. Taking into account all the requirements of the State Building Regulations (DBN), as well as all the wishes of the customer, we carefully calculated and designed every detail and component of the system.
Design environment: REVIT
Villa "Magnolia"
ENGINEERING AND CONSULTING
In connection with the difficult conditions caused by hostilities in the territory of Donetsk region, the design of water supply and sewage systems for the reconstruction of a school in the city of Selidove includes a number of specialized and adaptive solutions.
The project of external water supply and sewage systems for the school in Selidovo was designed taking into account the difficult conditions caused by military actions. Thanks to innovative solutions and adaptation to local conditions, the reliability, safety and environmental friendliness of the functioning of these systems is ensured, which is the key to the long-term operation of the school complex.